circulair PRODUCTS | SDG 8, 9, 12, 13, 15

RENOVATION OF BUILDING A 

In 2020, the Province of Zeeland awarded the contract to renovate the entrance to the provincial government building in a sustainable and creative way. 

This takes into account the demand for facilitating informal collaboration and brief consultations. The invitation to tender also takes into account the ambition of the Province of Zeeland in the field of sustainability and CO2 reduction. 

The aim of the renovation is to create an open network space where people can meet and collaborate with collegeaus and external parties. 

ABOUT THIS PROJECT

Client: Province of Zeeland

Contractor : Denys Engineers & Contractors BV (main contractor), Spie Netherlands (subcontracting)

CPV Code: 45262700 – Renovation Works 

Period:  The contract was awarded on 25 March 2020. 

Suppliers products:
Kloeber WOOOM: chairs and relax armchair 
Masters in wood Middelburg: oak tables 
Sedum roof  
Moooi: Emporor lamp

THE RENOVATION OF BUILDING A CONTRIBUTES TO THE FOLLOWING SUSTAINABLE GOALS, THE SO-CALLED SUSTAINABLE DEVELOPMENT GOALS (SDG)

positive impact indicators

The indicators are based on NPR-CEN/TR 16208 for bio-based products. For reusability, the formula from the Cradle to Cradle Product Standard v3.0 has been used.

INDICATOR 1

The percentage of biobased raw materials in the product in relation to the total mass.

Biobased raw materials come from biomass (the biodegradable fraction of agriculture, forestry, aquaculture, industrial waste and household waste).

INDICATOR 2

Improved functionality or technical performance by using biobased raw materials. 

For example: lasts longer, no emission of hazardous substances, no waste, improves air quality, less maintenance, etc.

INDICATOR 3

Insight into the CO2 emissions during the entire lifespan.

Visualize the CO2 emissions for all phases of the product life: processing, transport, use and waste.

ISO14040/14044, EPD or MPRI sheet

INDICATOR 4

Reusability

(A) % reusable or compostable at end of life

(B) % recycled raw material or renewable raw materials in the product

Formula : (2A + B) /3 x 100

THE TENDER

In order to achieve a uniform appearance within the abbey complex in which the various spaces are connected and to create openness, the architect has been commissioned to draw up a plan based on a program of requirements that fits within the available budget. 

Sustainability, including CO2 reduction and the use of biobased materials, has been included where possible within the plan. 

Extra attention was also paid to security, climate, energy consumption and acoustics. 

THE OFFER

The following products have been assessed:

  • Conference chair OXXO 
  • Office chair BeBrave
  • Relax armchair WOOOM
  • Oak tables Masters in Wood
  • Lamp Moooi
  • Sedum roof

oak tables

relax armchair 

sedum roof

gebouw A

lamp moooi

CONFERENCE CHAIR 

office CHAIR 

“A future-proof, sustainable network space and entrance to the monumental Zeeland provincial house”

Jacqueline de Vries- Biersteker

project leader facilities , Province of Zeeland

we make positive impact

    join us

Share This